How to operate FGD Pumps in series?

If you’ve ever worked in a flue gas desulfurization (FGD) plant, you know FGD pumps are the unsung workhorses of the operation. They move the alkaline slurry—usually a mix of limestone and water—through the absorption tower, pipework, and process equipment, ensuring that sulfur dioxide from boiler exhaust is neutralized before being released into the atmosphere. For many plants, operating these pumps in series isn’t just a technical choice; it’s a necessity when you need to boost pressure to overcome long pipe runs, high static heads, or equipment like mist eliminators and gas distributors that create significant flow resistance. FGD Pump

But let’s be honest, getting series operation right isn’t as simple as hooking two pumps together and flipping a switch. Over the 15 years I’ve been supplying FGD pumps to plants across North America, I’ve seen every mistake in the book: pumps overheating, slurry recirculating instead of moving through the process, even catastrophic seal failures that shut down operations mid-shift. Today, I’m walking you through how to operate FGD pumps in series safely, efficiently, and in a way that extends the lifespan of your equipment—plus a few insights from our team that we only share with long-term customers.

First, let’s clarify what series operation actually means for FGD pumps, because it’s different from other pump applications. Unlike water pumps moving clean, thin fluid, FGD pumps handle abrasive, dense slurry (typically 25-35% solids by weight) that’s prone to settling and clogging. When you run FGD pumps in series, you connect the discharge of the first pump (called the “lead pump”) to the suction of the second pump (the “lag pump”), so the flow rate through both pumps is identical, but the total head is the sum of each individual pump’s head. That’s key: flow rate stays the same, pressure doubles (or more, if pumps are matched correctly), not the other way around. If you try to push more flow than either pump is rated for, you’ll end up with cavitation, which erodes impellers and casing faster than any abrasive slurry.

Before you even turn on a single pump, there are two non-negotiable pre-operation checks that we drill into every customer’s maintenance team when we deliver our pumps. The first is matching the pump characteristics. This isn’t just about picking two pumps from the same model line—though that’s a good start. For series operation, both pumps must have nearly identical flow rates at their design head and operating speed. If your lead pump has a higher flow rating than your lag pump, the lag pump will act as a restriction, creating backpressure that forces slurry to recirculate through the lead pump’s seal and impeller. Over time, that recirculation will cause the lead pump to run hot, and if your slurry has limestone, the heat can speed up crystallization, clogging impeller passages and reducing efficiency.

The second pre-operation check is the suction side of the lag pump. This is where most first-time series operators go wrong. FGD slurry is heavy—specific gravity of 1.2 to 1.5 is common—and if the lag pump’s suction line is too small, or there’s a drop in pressure at its inlet, the slurry will flash into vapor, causing cavitation. We always insist on a minimum net positive suction head available (NPSHa) of 5 feet for series FGD pump setups, and we size lag pump suction lines 1 inch larger than the lead pump’s discharge line to keep velocity low. We also install a pressure gauge at the lag pump suction—we tell our customers to log this every shift, because a sudden drop in suction pressure is the first sign of a problem.

Now, the step-by-step operation process. I know it can be tempting to turn both pumps on at once to save time, but that’s a quick path to downtime. Here’s the sequence we recommend, refined over hundreds of installations:

First, prime both pumps properly. Slurry pumps can’t run dry, and improper priming is the leading cause of seal failure. For FGD pumps, we use a self-priming system that flushes water through the pump casing to fill it with slurry before starting. Make sure the discharge valves for both pumps are closed during priming—opening them too early creates a vacuum in the lag pump suction that’s hard to break. Once the priming bleeder valve shows a consistent, slurry-free flow (that means all air is out), you’re ready to start the lead pump.

Start the lead pump first. Once it’s up to speed and the pressure gauge on its discharge reads a steady, normal value, slowly open its discharge valve. Don’t open it all the way at once—this will send a surge of slurry into the lag pump suction, causing pressure spikes. Open the valve until you reach the system’s design flow rate—check your FGD tower’s flow transmitter, that’s your reference, not just the pump’s curve. Let the lead pump run like this for 5 minutes, just to make sure the line to the lag pump is full and there’s no air trapped.

Next, start the lag pump. Again, make sure its discharge valve is closed. Start the motor, wait for it to reach full speed, then slowly open its discharge valve. As you open it, watch the pressure gauges: the lag pump’s discharge pressure should rise smoothly, and the lead pump’s discharge pressure will drop slightly (this is normal, because the lag pump is now pulling flow through the system). Keep opening the lag pump’s valve until the combined system pressure matches your design setpoint. This is where matching pump curves pays off—if they’re correctly sized, you won’t have to adjust either valve more than 10-15% from their mid-position to hit the right pressure.

Once both pumps are running, there are a few real-time checks to do every shift. First, log both pumps’ suction and discharge pressures. If the lead pump’s discharge pressure drops more than 10% from its baseline, that means the lag pump is creating too much backpressure, or there’s a clog in the line between them. If the lag pump’s suction pressure drops, check for a clogged strainer or a leak in the suction line. Second, listen to the pumps. FGD pumps should have a steady, low-pitched hum—any rattling or grinding is a sign of cavitation or impeller damage. Third, check the seal flush system. All our FGD pumps come with dual mechanical seals, and the seal flush is critical when running in series: the lag pump’s seal pressure should be 15-20 psi higher than its suction pressure, and the lead pump’s seal pressure should be 10 psi higher than its discharge pressure when paired with a lag pump. The extra pressure difference keeps slurry from leaking past the seal face, which is a common maintenance headache.

Now, what about common operational mistakes that even experienced operators make? Let’s talk about off-design operation. A lot of plants adjust their FGD flow rate depending on the boiler load—if you run the pumps below 50% of their design flow, that’s when problems start. At low flow, slurry can settle in the pump casings, and the recirculation through the seal becomes excessive. If you have to run at partial load, we recommend adding a recirculation line between the lag pump’s discharge and the lead pump’s suction, sized for 10% of the design flow. This keeps slurry moving through the lead pump, preventing settling, without putting extra strain on the system.

Another mistake is tripping the lag pump first. If you lose power or have to shut down one pump, always trip the lag pump first, then the lead pump. If you trip the lead pump first, the lag pump will act as a brake, pulling vacuum on the line and causing slurry to flow backward into the lead pump, which can damage the impeller and clog the casing. We’ve had customers skip this step and end up with $20,000 in repair bills because they had to replace two impellers and a casing after a single wrong shut down sequence.

When it comes to maintenance, series operation doesn’t change much from standard FGD pump maintenance, but there are a few extra checks. Every quarter, we recommend doing a pump performance test: run each pump individually and measure its head and flow, then run them in series and compare to the combined curve. If the actual head is less than 90% of the expected value, that means one of the impellers is eroded, or there’s a clog in the piping between them. Also, when you replace a pump in a series setup, never just swap in a random model—always contact our technical team to match the new pump’s curve to the existing one. We’ve had a customer try that once and end up with the lag pump acting as a flow restrictor, cutting their desulfurization efficiency by 15% for three months until we re-matched the pumps.

Let’s also touch on why our FGD pumps are designed specifically for series operation, not just any slurry pump. All our pumps have closed impellers optimized for high-head, low-flow slurry applications, and their casing thickness is 20% thicker than standard FGD pumps to handle the extra pressure from series operation. We also include a pre-built piping adapter for series setups, so our customers don’t have to modify their existing piping, which saves installation time and reduces the risk of leaks.

If you’re thinking about switching to series operation for your FGD system, or you’re having issues with your current series setup, the best next step is to talk to the experts. We’ve worked with over 200 FGD plants, from small municipal facilities to large utility plants, and we can conduct a free on-site audit of your current pump setup, check your pump curves, suction lines, and seal systems, and give you a custom recommendation to improve efficiency and reduce downtime. We don’t do one-size-fits-all solutions—every FGD system is different, and we tailor our advice to your plant’s specific load and layout.

I’ve seen too many plants lose money because they don’t operate their FGD pumps in series correctly: higher maintenance costs, lower desulfurization efficiency, unplanned shutdowns that delay boiler operations. But when done right, series operation can cut your energy costs by up to 25% compared to running larger single pumps, because our high-efficiency FGD pumps have lower brake horsepower requirements at the series operating point. It’s not just a technical tweak—it’s a way to make your FGD system more reliable and profitable.

If you’re ready to optimize your FGD pump operation, or you need to replace aging pumps for a series setup, reach out to our team. We’ll connect you with a field engineer who specializes in FGD systems, walk through your current setup, and answer any questions you have about series operation, maintenance, or pump selection. Don’t let avoidable mistakes cost you downtime and repair bills—let’s work together to get your FGD pumps running at their best.

Sand Pump References:

  1. Energy Institute. (2019). Flue Gas Desulfurization (FGD) System Optimization Manual. Energy Institute Press.
  2. American Water Works Association. (2020). Pump Operation and Maintenance for Industrial Slurry Applications. AWWA Manual M32.
  3. Hydraulic Institute. (2018). Pump Series Operation Guidelines for Abrasive Slurries. Hydraulic Institute Standards.
  4. Limestone FGD Operators Association. (2021). Best Practices for Series Pump Operation in Wet FGD Systems. LFOA Technical Bulletin 07-21.

Shijiazhuang Ruite Pump Co., Ltd.
As one of the most professional FGD pump manufacturers and suppliers in China, we have world-leading production equipment and strong manufacturing capabilities. Please feel free to buy durable FGD pump for sale here from our factory. Quality products and reasonable price are available.